Concrete Block Calculator
Blocks by course, mortar bags from the manufacturer’s yield, and grout for filled cores, for any wall length and height.
Block wall list
| Item | Qty | Notes |
|---|---|---|
| Concrete block 16×8×8 in. | 95 | |
| Mortar mix, 80 lb bags | 7 |
How the block count works
Area-based counts (wall area × 1.125) are fine for a budget but wrong for an order, because walls are built in whole courses and every course ends where the wall ends. The calculator counts the way a mason lays out: courses = wall height ÷ unit height, rounded up; blocks per course = wall length ÷ unit length, rounded up. It then takes out whole blocks for openings and adds your breakage allowance.
Worked example: a 40 × 4 ft garden wall
- Courses: 48 ÷ 8 = 6. Per course: 480 ÷ 16 = 30. Net blocks: 180; with 5% breakage, 189.
- Mortar: 180 ÷ 13 = 13.8, so 14 bags of 80 lb.
- Core fill at rebar cells every 48 in.: one cell in six of 0.25 ft³ per block = 7.6 ft³, or 14 bags of 80 lb concrete with a 10% allowance.
Before you build
- Footing first. A block wall sits on a concrete footing below the frost line. Size it with the wall-footing mode of the concrete calculator; the IRC sets a 6 in. minimum footing thickness (R403.1.1).
- Retaining soil changes everything. A wall that holds back soil needs drainage, reinforcement and often engineering. For landscape walls, segmental retaining-wall units are designed for that job; see the retaining wall calculator.
- Check the unit’s data sheet. Hollow units under ASTM C90 vary in how solid they are. The solid percentage on the manufacturer’s sheet drives the grout estimate.
Common mistakes
- Forgetting corners and ends. If you need clean ends, order corner (or bullnose) units separately; they replace regular blocks one for one.
- Ordering exactly. Blocks chip in delivery and cutting; 5% spare is normal, 10% for walls with many openings.
- Mixing too much mortar at once. Mortar has a working life; mix what you can lay before it stiffens and don’t re-temper it more than the bag allows.
Laying out the first course
Dry-lay the first course on the footing before mixing mortar. Adjust the head joints slightly so the wall ends on a full or half block instead of a sliver; it saves cutting and looks better. Snap a line for the face of the wall, set the corner or end blocks first, level and plumb them, then string a line between them for every course. Check each corner for plumb and the wall for level every two or three courses; small errors in the first courses are visible at the top.
Block walls need time: mortar has to stiffen before the next few courses go on, and grouted cells should be filled in lifts the reinforcement design allows. In cold weather, protect fresh work from freezing.
Questions people ask
How many concrete blocks per square foot?
How many blocks are in a 4 ft high, 40 ft long wall?
How much mortar do I need for block?
How much grout fills the cores?
What does “nominal size” mean for block?
Sources
- QUIKRETE Mortar Mix data sheet (No. 1102) — QUIKRETE, checked Nov 2026. One 80 lb bag lays about 13 standard 8×8×16 in. blocks or 37 bricks.
- ASTM C90: Standard Specification for Dry-Cast Loadbearing Concrete Masonry Units — ASTM International, checked Nov 2026.
- 2021 International Residential Code (IRC) — International Code Council, checked Nov 2026.
Related calculators
All outdoor tools →Concrete Calculator
Slabs, footings, columns, post holes and steps in cubic yards and 40–80 lb bags.
Retaining Wall Calculator
Blocks, caps, base and drainage stone, with permit and engineering flags.
Square Footage Calculator
Rectangles, triangles, circles, L-shapes and several areas at once, in ft² and m².
Concrete Slab Cost Calculator
Installed slab cost or ready-mix by the yard, any thickness, adjusted for your region.
Post Hole Concrete Calculator
Bags per hole with the post’s own volume taken out, plus drainage gravel.
Gravel Calculator
Cubic yards and tons of gravel or base, with a compaction allowance.