Outdoor · Concrete

Concrete Calculator

Pick the pour, enter the size, and get cubic yards to order or bags to haul, with a waste allowance you control.

Code basis: 2021 IRC R403.1, R506.1Sources

1 What are you pouring?
Units
2 Dimensions
Shape
ft
ft
in
4 in. for patios and walks; 5–6 in. for driveways and hot-tub pads
3 Order
%
5–10% covers spills and uneven subgrade
Concrete
1.63yd³
1.25 m³ incl. 10% waste
Cubic feet
44.0ft³
40.0 ft³ net
80 lb bags
74
Premixed concrete
Ready-mix
1.75yd
Ordered in ¼ yd steps
Bags by size
Bag size80 lb60 lb50 lb40 lb
Bags needed7498118147
At 1.63 yd³ you would mix 74 bags of 80 lb (3.0 tons by hand). Compare a ready-mix delivery; many plants add a short-load fee under their minimum order, so ask.

Concrete order

Concrete order
ItemQtyNotes
Concrete (ready-mix)1.75 yd³120 ft² slab × 4 in
Premixed concrete, 80 lb bags74if mixing by hand or in a mixer
Compacted gravel base, 4 in.1.70 yd³incl. 15% compaction

How the concrete calculator works

Every pour is a volume, and every volume is some version of length × width × depth. The calculator works in cubic feet internally, adds your waste allowance, then converts to the units you actually order in: cubic yards for a ready-mix truck, cubic meters if you think in metric, and bags of premixed concrete by weight.

lengthwidththicknesscompacted gravel base
A slab is a box: the thickness matters as much as the footprint. One extra inch on a 4 in. slab adds 25% more concrete.
Slab: length × width × (thickness ÷ 12) Footing: length × (width ÷ 12) × (depth ÷ 12) Column: π × (diameter ÷ 24)² × height Post hole: (π × r² − post area) × (depth − gravel) ÷ 1728 Steps: width × run × rise × n(n + 1) ÷ 2 (+ top landing) Cubic yards: cubic feet ÷ 27 Bags: cubic feet ÷ bag yield (80 lb = 0.60 ft³)

The steps formula looks odd until you picture a solid stair as stacked blocks: the bottom block is one riser tall, the next is two risers tall, and so on, so the total is 1 + 2 + … + n risers deep. The post-hole formula subtracts the post itself, which matters more than people expect: a 4×4 in a 10 in. hole takes up about 16% of the hole.

Worked example: a 12 × 10 ft patio, 4 in. thick

  1. Area: 12 × 10 = 120 ft².
  2. Volume: 120 × (4 ÷ 12) = 40 ft³, or 1.48 yd³.
  3. Add 10%: 44 ft³ = 1.63 yd³.
  4. Bags: 44 ÷ 0.60 = 73.3, so 74 bags of 80 lb (about 3 tons), or 98 bags of 60 lb.
  5. Ready-mix comes in quarter-yard steps, so you would order 1¾ yards.

Three tons of bags is a lot of lifting and mixing. At this size most people price a truck, or a trailer-mix service if the plant has a minimum.

Bag yields and why we don’t round them up

The yield printed on a bag is the cured volume. QUIKRETE lists 0.60 ft³ for its 80 lb concrete mix and 0.30 ft³ for 40 lb; 60 lb and 50 lb bags follow the same yield per pound (0.45 and 0.375 ft³). High-strength and fast-setting mixes can yield slightly less, so check the bag you are buying. We round the bag count up, never the yield.

Mistakes that cost a second trip

  • Measuring the form, not the hole. Excavations are never flat. Measure depth in several spots and use the average, or add 5% more waste for rough subgrade.
  • Forgetting the thickened edge. Many slabs have a deeper perimeter (a turned-down edge). Add it as a separate footing run of the extra depth.
  • No base. A slab needs a compacted gravel base, typically 4 in., to drain and stay flat. The shopping list adds it.
  • Ordering exactly to the yard. Running short mid-pour leaves a cold joint. A 5–10% allowance is cheaper than a second delivery.
  • Frost depth. Footings and post holes must reach below your local frost line (IRC R403.1.4). Your building department publishes the number.

Saving money on a pour

  • Get the base, forms and reinforcement inspected and ready before the truck is booked; waiting time on site is usually billed.
  • Pour several small jobs (a pad, a few footings, steps) from one truck instead of separate short loads.
  • Keep bags for small, scattered work such as post holes, where a truck can’t reach anyway.

Need a price as well as a volume? The concrete slab cost calculator uses published per-square-foot and per-yard ranges adjusted for your region. Building a deck? Size each footing with the deck footing calculator first, then bring the dimensions back here.

Questions people ask

How many bags of concrete are in a cubic yard?
A cubic yard is 27 cubic feet. At the yields printed on QUIKRETE’s bags (0.60 ft³ for 80 lb, 0.30 ft³ for 40 lb) that is 45 bags of 80 lb, 60 bags of 60 lb or 90 bags of 40 lb, before any waste allowance.
How much concrete do I need for a 10×10 slab 4 inches thick?
10 × 10 × (4 ÷ 12) = 33.3 cubic feet, which is 1.23 cubic yards. With a 10% allowance that is 36.7 ft³: 62 bags of 80 lb, or order 1.5 yards of ready-mix.
How thick should a concrete patio or driveway be?
Four inches is the usual thickness for patios and walks, and the IRC’s minimum for a slab-on-ground floor is 3½ inches (R506.1). Driveways that carry cars are commonly poured 5–6 inches thick, and pads for hot tubs or heavy equipment often 6 inches. Your local code and the load decide; ask the building department for driveways in the right-of-way.
When is ready-mix cheaper than bags?
Compare your local prices: multiply the bag count by the bag price, add a mixer rental, and compare it with the ready-mix price per yard plus delivery. As a rule of thumb, beyond about one cubic yard most people order a truck simply because mixing 45+ heavy bags by hand is slow and the concrete starts setting before you finish. Ask the plant about short-load fees under its minimum.
How many bags of concrete per fence or deck post?
It depends on the hole, not the post: a 10 in. hole 36 in. deep with 6 in. of gravel and a 4×4 post holds about 1.15 ft³ of concrete, which is two 80 lb bags. Use the post-hole mode above, or the dedicated post hole concrete calculator for a whole fence or deck.

Sources

  1. QUIKRETE Concrete Mix (No. 1101): yield per bag — QUIKRETE, checked Nov 2026. 80 lb bag yields about 0.60 cu ft; 40 lb about 0.30 cu ft. 60 lb (0.45) and 50 lb (0.375) follow the same yield per pound.
  2. 2021 International Residential Code (IRC) — International Code Council, checked Nov 2026.
  3. Producer Price Index by Commodity: Ready-Mixed Concrete (WPU1333) — U.S. Bureau of Labor Statistics via FRED, checked Nov 2026.

Related calculators

All outdoor tools →